MINING COMPANY NEED CAST PUR PART WITH IMPROVED PROPERTIES
Challange
The purpose was to improve the productivity by improving material and design on a hot cast PUR part together with existing toll-manufacturers.
Task
We measured the quality on the existing part . We optimized material properties and design and tested new material and design vs the old application.
Result
As the mechanical properties and life time on the final application was increased several times we had to work with the toll-manufacturer who could accept to work with the new material and technique.Today the part is working well and and the Mine can work with increased productivity and controlled maintenance.